Title: Cost Control and Performance of Network Expansion Projects: Evidence from Amtel Ltd., Mogadishu, Somalia
Authors: Ali Abdi Abdullahi and Dr. Elijah Omollo
Volume: 10
Issue: 10
Pages: 82-92
Publication Date: 2026/10/28
Abstract:
This study examined the effects of cost control on the performance of network expansion projects at Amtel Ltd. in Mogadishu, Somalia. Anchored in the Iron Triangle Theory and Agency Theory, the study adopted a descriptive-correlational design within a mixed-methods approach, drawing a Slovin-determined sample of 138 respondents (126 quantitative staff across four functional strata, plus 12 purposively selected key informants) from a target population of 210 project-related staff. A structured questionnaire and a semi-structured interview guide were administered; 120 questionnaires and all 12 interviews were completed, a 95.6% response rate. Content validity (CVI = 1.00) and reliability (Cronbach's ? = .873 for the cost-control scale) were both satisfactory. Descriptive results showed that respondents generally agreed that Amtel Ltd. practises effective cost control (mean = 3.81, SD = 0.97), rating its direct positive effect on project performance highest (mean = 4.04) and its contribution to timely project completion lowest (mean = 3.33, the only item rated Moderate), while overall project performance was itself rated High (mean = 3.70, SD = 1.03). Pearson correlation revealed a strong, statistically significant positive relationship between cost control and project performance (r = .741, n = 120, p < .001), the strongest bivariate relationship among the three cost-management dimensions examined in the parent study, and simple linear regression confirmed cost control as a significant predictor, explaining 54.9% of the variance in project performance (Rē = .549, ? = .741, F(1, 118) = 143.992, p < .001); the null hypothesis was rejected. Interview accounts corroborated these results, crediting expenditure approval procedures, computerised financial monitoring, and periodic variance analysis for strengthened financial accountability, while identifying procurement delays and emergent technical requirements, rather than weak financial discipline, as the main residual constraint on timely completion. The study concludes that cost control is the strongest single determinant of network expansion project performance among Amtel Ltd.'s cost-management practices, and recommends that Amtel Ltd. and comparable operators invest in integrated, real-time financial monitoring systems and couple cost-control mechanisms with stronger schedule and procurement management to convert financial discipline more fully into timely project delivery.